商业类
Commercial construction projects
联想大厦记忆科技后海中心
Lenovo Building Memory Technology Houhai Center
项目建筑面积
PROJECT FLOOR AREA
112050
项目概况
PROJECT PROFILE

项目是坐落于后海金融总部基地的新一代综合体,总建筑面积30万方,总投资近100亿元。聚合知名建筑设计KPF、景观设计ALN、商业设计LEAD8等顶尖团队智慧,依托中建一局、中建安装、智宇实业等头部单位精益施工。两座塔楼之间形成的「门」状的标志性造型,既确保了建筑的辨识度,也彰显着后海作为粤港澳大湾区的门户地位。

The project is a new-generation integrated complex located in the Houhai Financial Headquarters Base, with a total construction area of ​​300,000 square meters and a total investment of nearly 10 billion yuan. It brings together the expertise of top-tier teams such as renowned architectural design KPF, landscape design ALN, and commercial design LEAD8, and relies on the meticulous construction techniques of leading companies such as China Construction First Group, China Construction Installation, and Zhiyu Industrial. The iconic "gate" shape formed between the two towers ensures the building's recognizability and highlights Houhai's status as a gateway to the Guangdong-Hong Kong-Macao Greater Bay Area.

点击展开
施工范围
SCOPE OF CONSTRUCTION

记忆科技后海中心B栋24F~28F多联机空调供货及安装,室外及室内机的供货及安装,精装户型多联式空调系统的设备供应、安装、调试和验收;冷媒系统(含保温)、空调风管(含保温)、冷凝水管(含保温)、冷媒的充注等设备与材料的采购、安装、调试;新风系统、卫生间排风;装饰百叶风口供应及安装;配电箱至空调室外机及室内机之间的电缆的敷设及安装控制系统的设备与材料的采购、安装(包含线缆的敷设、接线等)、调试;不含强电电线线管敷设(精装单位施工);含室外机镀锌支架;其他与多联机空调供货及安装相关的事宜。

Supply and installation of multi-split air conditioning units for floors 24-28 of Building B, Houhai Center, Memory Technology; supply and installation of outdoor and indoor units; equipment supply, installation, commissioning, and acceptance of multi-split air conditioning systems for fully furnished apartments; procurement, installation, and commissioning of equipment and materials such as refrigerant systems (including insulation), air conditioning ducts (including insulation), condensate pipes (including insulation), and refrigerant charging; fresh air system and bathroom exhaust; supply and installation of decorative louvered air vents; laying and installation of cables from the distribution box to the outdoor and indoor units; procurement, installation (including cable laying and wiring), and commissioning of control system equipment and materials; excluding high-voltage electrical wiring conduit laying (construction by the fully furnished unit contractor); including galvanized brackets for outdoor units; and other matters related to the supply and installation of multi-split air conditioning units.

点击展开